Six stages. None skipped. Each one shorter.

The speed comes from compressing the stages, not removing them. Drafting — scaffolding, boilerplate, first-pass copy, test cases — is generated in minutes and then reviewed exactly as it always was. Discovery, design judgement, architecture and QA still take human time, so the time saved is real but limited to the repetitive parts of the work.

process

Our software development process, in six stages.

The speed comes from compressing the stages, not removing them.

01

Brief & discovery

We read whatever exists — notes, a competitor you like, an old site, a spreadsheet — and turn it into a written scope with user stories and edge cases. You approve it before anything else starts.

typical: 2–3 days
02

Interface design

Several visual directions explored quickly, one taken to high fidelity and built into a token-based design system. You get a clickable prototype, not a static image.

typical: 3–5 days
03

Architecture

Data model, integrations, hosting, auth, and where AI sits in the flow. Decided and written down before code, because this is the part that is expensive to change later.

typical: 1–2 days
04

Build

Frontend, backend and AI features developed against a preview link you can open every day. Weekly demo, decisions logged, scope changes priced as they come.

typical: 1–4 weeks
05

Test & review

Automated tests, accessibility pass, performance budget, and evaluation runs for every AI feature against a real example set. Fixes before launch, not after.

typical: 2–4 days
06

Launch & handover

Deploy, monitoring, analytics, a written runbook and a recorded walkthrough. Then 30 days of support included while your team settles in.

typical: 1–2 days
where ai saves time

How AI shortens a software project, task by task.

These are our planning estimates for comparable scope, not guarantees. The grey bar is typical effort without AI; the colour bar is what we plan for with AI generating first drafts of code, copy and tests. The review, testing and accessibility steps still happen in full.

Discovery & requirements
without AI · 2 wks
with AI (est.) · 2 days
5×
Wireframes & user flows
without AI · 2 wks
with AI (est.) · 2 days
6.7×
High-fidelity UI design
without AI · 3 wks
with AI (est.) · 4 days
4.3×
Design system & components
without AI · 2 wks
with AI (est.) · 2 days
5×
Frontend build
without AI · 4 wks
with AI (est.) · 1.1 wks
3.6×
Backend, database & APIs
without AI · 4 wks
with AI (est.) · 1.2 wks
3.3×
Third-party integrations
without AI · 1.5 wks
with AI (est.) · 2 days
3.8×
Copy & content, 40 pages
without AI · 3 wks
with AI (est.) · 1 day
15×
SEO metadata & schema
without AI · 4 days
with AI (est.) · 1 hr
32×
Localisation, 2 languages
without AI · 1.5 wks
with AI (est.) · 6 hrs
10×
Test suite & QA pass
without AI · 1 wks
with AI (est.) · 4 hrs
10×
Accessibility audit & fixes
without AI · 3 days
with AI (est.) · 5 hrs
4.8×
Deployment pipeline
without AI · 3 days
with AI (est.) · 2 hrs
12×
5.0×estimated average speed-up
104 daysestimated saving, typical build
0steps skipped to get there

Estimates for planning, not measured results. Real timelines depend on scope, integrations and how quickly decisions and content arrive — your written proposal gives a dated plan for your project.

ai tools & technologies

The AI tools we use at each stage of a build.

Tools change; the discipline around them is the part we keep.

Research

Competitor and SERP teardowns, requirement drafts from messy client notes, user-story generation, and the edge cases we would otherwise find in week three.

ClaudeChatGPTPerplexity

Model and vendor choices are made per project on cost, latency, data residency and quality — never by default.

See the process on your own project.

A 30-minute demo walks through the six stages against your brief, with a realistic calendar and a rough range. No deck.